Locals request ‘gate keeper; group for river restoration

By RANDALL WASZYNSKI
Posted 11/15/18

The Town of Brookhaven has estimated that 600 cubic yards of sediment has accumulated in the pool beneath the spillway of Lily Lake Dam. A hose connected to a portable trash pump has been placed in the water.

This item is available in full to subscribers.

Please log in to continue

E-mail
Password
Log in